Utility Locating and Potholing

The line on the plan is not a force field.

Trace, mark and physically expose underground services before the drill or excavator reaches them.

Plans start the conversation

Physical evidence finishes it.

Underground records tell you what should be there. Locating and potholing tell you what can actually be found.

Before drilling or excavation, known and suspected services should be reviewed, traced where practical and physically confirmed at critical crossings or conflict points.

The ground has never been required to read the plan.

Electromagnetic locating

Trace conductive services using suitable active and passive locating methods where access and asset construction allow it.

Route marking

Mark detected service alignments and relevant site information so the work team can plan around them.

Depth indications

Collect locator depth information as a guide, then physically verify critical locations before relying on clearance.

Crossing verification

Pothole proposed crossing points so bore path, excavation depth and separation can be based on actual exposure.

Daylighting

Expose services and structures sufficiently to understand their position, direction and practical effect on the job.

Site coordination

Compare plans, markings, surface evidence and exposed services rather than treating any one source as infallible.

Upload locator photo

Subsite locating equipment

Useful information in competent hands.

Locating equipment helps identify and trace underground assets. It does not create certainty where records, connections, access or service construction make certainty impossible.

We use locating alongside plans, site evidence, potholing and practical judgement.

A screen showing a number is not the same thing as an exposed service.

Before work begins

Build the bore path around what exists.

The useful outcome is not a collection of paint marks. It is enough reliable information for the drilling or excavation team to choose a safer, workable method.

  • Review utility plans and site records
  • Inspect visible service indicators
  • Trace accessible assets
  • Mark the detected alignment
  • Pothole critical crossings
  • Measure and record actual exposure
  • Adjust the work plan where required

Locating equipment provides information.

It does not replace records, physical verification, safe excavation practices or a functioning brain.

Holland Underground

Need a route checked before work starts?

Send the plans, proposed alignment and site location. We will identify what needs to be traced and exposed.