Directional drilling and support work across a staged route, with the practical set-up and equipment required to keep the installation moving.
A staged underground fibre installation requiring repeated directional-drilling set-ups and practical support along the route.
The work was less about producing one dramatic photograph and more about keeping the installation moving, managing the real site constraints and completing each stage properly.
