A longer route requiring repeated set-up, drilling support and coordination around the existing road and utility environment.
A longer staged fibre route through the existing road and utility environment.
The project required repeated drill set-ups, bore support and coordination around what was already in the corridor rather than pretending the alignment existed in empty ground.
