Fibre installation

Marybank

Approximately 800 metres of underground fibre installation work.

Directional drilling and support work across a staged route, with the practical set-up and equipment required to keep the installation moving.

A staged underground fibre installation requiring repeated directional-drilling set-ups and practical support along the route.

The work was less about producing one dramatic photograph and more about keeping the installation moving, managing the real site constraints and completing each stage properly.

Actual work.

Enough records to prove it. Not a camera crew pretending to create it.

Holland Underground

Have another route that needs doing properly?

Send the plans, location, product details and site constraints. We will talk about the work rather than invent a photoshoot around it.