Fibre installation

Mosston Road

Approximately 800 metres of underground fibre installation work.

A longer route requiring repeated set-up, drilling support and coordination around the existing road and utility environment.

A longer staged fibre route through the existing road and utility environment.

The project required repeated drill set-ups, bore support and coordination around what was already in the corridor rather than pretending the alignment existed in empty ground.

Actual work.

Enough records to prove it. Not a camera crew pretending to create it.

Holland Underground

Have another route that needs doing properly?

Send the plans, location, product details and site constraints. We will talk about the work rather than invent a photoshoot around it.