Projects

Real work rarely comes with a perfect photograph.

Most of our photos were taken to record a service, explain a problem, confirm a depth or document reinstatement. That is more useful than pretending every job happened at golden hour.

Field records, not a fashion shoot

The photos show the parts of the job that actually mattered.

A close-up of an exposed service can say more than a wide shot of a clean machine.

Our records tend to show the things that needed thought: congested crossings, awkward ground, unexpected services, entry and exit pits, drilling-fluid behaviour, repairs, measurements and reinstatement.

They are not always glamorous photographs of the entire site. They are evidence of the decisions that made the installation work.

We take what the job and the client need, then put the phone away and carry on.

We do not pay someone to manufacture the appearance of skill. The work has to prove it.

Less staged content.

More useful evidence of what was actually underground.

Selected field notes

Jobs, problems and the parts worth recording.

Each entry can show the overall job, a difficult crossing, an exposed service, a reinstatement detail or whatever best explains the work.

Gas network installation

Puriri Street Gas Main

150 mm and 80 mm PE gas pipeline installed through an established urban road corridor.

A staged directional-drilling installation running along Puriri Street and into Totara Street, with repeated drill set-ups, existing-service management and reinstatement through a live residential corridor.

  • Service: Gas network infrastructure
  • Method: Multiple directional-drilling shots
  • Area: Gonville, Whanganui
  • Year: 2022
View project

Power installation

Halswell Street

Approximately 40 metres of trenchless power installation.

A compact directional-drilling job where the route, existing services, entry and exit positions mattered more than the headline length.

  • Service: Power
  • Method: Directional drilling
  • Area: Whanganui
View project

Fibre installation

Mosston Road

Approximately 800 metres of underground fibre installation work.

A longer route requiring repeated set-up, drilling support and coordination around the existing road and utility environment.

  • Service: Fibre
  • Method: Directional drilling
  • Area: Whanganui
View project

Fibre installation

Marybank

Approximately 800 metres of underground fibre installation work.

Directional drilling and support work across a staged route, with the practical set-up and equipment required to keep the installation moving.

  • Service: Fibre
  • Method: Directional drilling and civil support
  • Area: Whanganui
View project

What belongs here

A project photo does not have to show the whole project.

Use the strongest available record: the service exposure that controlled the profile, the obstruction that changed the plan, the product entering the bore, the repaired surface or the finished patch after compaction.

The words provide the wider job context. The image shows the part that mattered.

Useful detail beats an impressive photograph with nothing to say.

  • Service exposures recorded
  • Critical depths and crossings documented
  • Bore alignment and product stages recorded
  • Reinstatement condition captured
  • Useful client and handover records supplied
  • Issues and changed conditions explained

Reinstatement

Bad reinstatement builds its own project gallery.

Some jobs do not need a caption. You can find them months later by following the slumped potholes.

Sunken patches, cracked seal, ponding, loose fill and repeat repairs are what happens when the visible finish is treated as somebody else's problem.

Good reinstatement is deliberately boring. Correct material, proper placement and compaction, a surface that matches and a finished site that stays finished.

The road should not have to advertise who was there.

What the camera normally misses

Skill mostly looks like ordinary decisions made at the right time.

The important work is rarely dramatic. It is the alignment changed before it becomes a problem, the service exposed before the drill arrives, the tooling altered when the ground changes and the operator knowing when another push is the wrong answer.

  • Set-up chosen for the bore, not the photograph
  • Known services located and physically exposed
  • Bore profile controlled rather than hidden at needless depth
  • Tooling and fluid matched to the ground
  • Changes made before a problem becomes damage
  • Support equipment available when conditions change
  • Potholes backfilled and compacted to stay put
  • Site left ready for the next stage

This is not a catalogue of every metre drilled.

It is a record of the work worth understanding.

Holland Underground

Have a job with more to it than the drawing suggests?

Send the plans, location and actual scope. We will talk through what needs confirming before the drill starts.